RIPLEY COUNTY PERMIT FEES

Improvement Location Permit

(Signs, Pond/Lake, Any Structure, Building, Improvement, or Alteration

$15.00

Single Family Dwelling

     Stick Built on Basement

$250.00

Single Family Dwelling

     Stick Built on Crawl Space

$225.00

Single Family Dwelling

     Manufactured Home on Steel Frame

$200.00

Single Family Dwelling

     Manufactured on Basement

$250.00

Single Family Dwelling

     Manufactured (Single Wide)

$100.00

Additions to residence/remodel

$100.00

(plus .05¢ Per Sq. Ft.)

Accessory Building Permit (Pole barns/detached garages, etc)

$100.00

Additions to Accessory Buildings

$75.00

In Ground Pool

$80.00

Commercial Building Permit (Requires State Release)

$200.00

(plus 0.8¢ Per Sq. Ft.)

Electric Upgrade

$40.00

Above Ground Pool

$40.00

Re-Inspection Fee (must be paid in advance)

$25.00

All buildings, regardless of the type of construction require an Improvement Location Permit per section 80.39(B) of the Area Zone Code.

 

950 S.F.- Minimum Living Requirements

(Mobile Homes-At least 14x70 and must be 1981 model or later)

Any building exceeding 144 S.F. requires a building permit

Minimum lot size: 2 acres with 200' road frontage

 

Before a building permit can be issued on new homes and bath/bedroom additions, we must have a septic permit from the Health Department

 

Property setback requirements:

Residential districts-25' front, 8'sidelines, 20' back of property

Agricultural districts-55' from center line of county road, 20' sideline, 20' back of property

(State Highway front setback requirement is 90' from center of line of State Road)